Entry Door & Trellis Refinishing in La Jolla

Last Updated: May 7, 2014

For this project, a homeowner in La Jolla hired us to refinish the entry door and the trellis since both showed signs of wear and fading.

Door & Trellis Refinishing Process

Our process included:

  1. Stripping and Refinishing the front door and threshold. We have to use chemical strippers to remove the old finish. Once the product has been removed, we are able to fully restain and finish the door.
  2. Prepping and Finishing the back trellis. As you can see from the first picture, the TOP of the trellis / patio cover really takes a beating from the sun and ocean climate. All those areas get fully primed before applying several finish coats.

We also patched a crack in the door and restored the door threshold. The project took about three days total.

Paint & Sealers Used

Call Chism Brothers Painting at 858-454-3850 with your painting and refinishing needs. We have provided professional and reliable painting services to La Jolla and San Diego for over 35 years.

August 20, 2026
Renting out an Encinitas home? Learn which painting projects can improve photos, first impressions, durability, and turnover readiness.
August 20, 2026
Stains, peeling, bubbling, or growth on shaded exterior surfaces can point to mildew, moisture, or failing paint. Learn what to check first.
August 20, 2026
Coastal and inland Encinitas homes can wear differently. Learn how marine layer, salt air, sun, shade, and prep affect repainting.
August 20, 2026
Adding an ADU in Encinitas? Learn why painting too early can lead to construction damage, stucco touch-ups, and avoidable rework.
August 20, 2026
Some painting projects are DIY-friendly, but height, prep, stucco repairs, access, and exterior damage can make hiring a pro smarter.
August 20, 2026
Newer paint should not peel quickly. Learn how prep, moisture, primer, caulking, coatings, and application issues can cause early failure.
August 20, 2026
Repainting a San Marcos HOA home? Confirm colors, finishes, repairs, documents, and approval steps before painters begin.
August 20, 2026
Planning roof work, solar, stucco repairs, or exterior painting in San Marcos? Learn what should usually happen first to avoid rework.
August 20, 2026
Weathered fascia, trim, and exterior wood may need repair or replacement before paint. Learn what to check before repainting.
August 20, 2026
Peeling or bubbling paint can point to age, poor prep, moisture, or surface damage. Learn what to check before repainting.

Tell us about your project

Tell Us About Your Project

Contact us today to schedule a visit from one of our estimators! We’ll come to your home and provide a detailed estimate.


(858) 454-3850


Est 1982